Roof Replacement - 2017



Some old shots of the house as it was.


5624 5622
October 7, 2003 - before painting
 
5682 5683
October 23, 2003 - after painting
 

C0915101 C0915102 C1408501
May 31, 2009
 
May 31, 2009 March 26, 2014


Friday, March 31 — With replacement looming, I took a few shots on Friday afternoon.


C1709001 C1709002 C1709003

 
C1709004 C1709005 C1709006

 


Day 1, Wednesday, 5th — The scaffolding was erected in one day. I took the first three shots at the front that evening and the next three at the back on Friday morning.


C1709501 C1709502 C1709503

 

C1709701 C1709702 C1709703

 


Day 4, Saturday, 8th — The roofers started, stripped most of the roof and felted it. I took the first 4 shots at lunchtime, the next four that evening and two early on Sunday morning.


C1709801 C1709802 C1709803

 
C1709804 C1709805 C1709806

 
C1709801 C1709802

 
C1709901 C1709902

 


Day 5, Sunday, 9th — They finished stripping the roof and demolished the chimney stacks. (Ouch.) All three shots in the evening.


C1709903 C1709904 C1709905

 


Day 6, Monday, 10th — It took most of the day to raise the new tiles onto the roof. Two shots in the evening, the third early next morning.


C1710001 C1710002 C1710101

 


Day 7, Tuesday, 11th — Most of the new tiles were installed, new skylights and guttering. Again, first two shots in the evening, the third early next morning.


C1710102 C1710103 C1710201

 


Day 8, Wednesday, 12th — Roof finished and work started above the bay windows. All three shots taken in the evening.


C1710202 C1710203 C1710204

 


Day 9, Thursday, 13th — A rest day.



Day 10, Friday, 14th — More work above the bay windows and round the back but not much visible change so no photos. In fact, since there was no obvious change for a while, I sort of lost interest in taking photos.



Monday, 17th — Scaffolding on my half of the block was taken down, much to my relief. Next door still to be re-roughcast.



Monday, 24th — A few more photos before the roughcasting starts next door.


C1711401 C1711402 C1711403

 

C1711404 C1711405 C1711406

 



Sunday, 14th May — Rone pipe at front apparently blocked, one man arrived and dug it up in pouring rain.

Monday, 15th May — Last of scaffolding removed. Rone pipe at front disintegrated in pouring rain. Someone arrived and fixed it.


 